Stop planning your day around the nearest public charger. A clean, code-correct Level 2 install — load calc included.
Barnes Electric installs Level 2 EV chargers for Lakeland homeowners. Every job includes the service load calculation, a dedicated 240V circuit, conduit run, breaker sizing, and GFCI protection — documented work by a Florida-licensed residential electrical contractor, not a handshake install.
We check panel capacity before running a single wire. A 48A continuous EV draw is the largest single load most homes carry — the math matters.
Not shared, not borrowed from another breaker.
Clean run from the panel to the garage or exterior mounting location.
Sized to the charger and protected to code.
If your panel is at capacity, we tell you upfront. Panel upgrades are a separate service we handle in-house — same license, same crew, one trip.
Tesla Wall Connector — hardwired 48A, sized to your home’s actual load. ChargePoint Home Flex — 16–50A adjustable, NEMA 14-50 or hardwired. Eaton, Leviton, and other UL-listed Level 2 EVSE — if your charger arrived in a box, we can install it to code. We hold Florida ES license ES12000724 — documented work you can verify, not a manufacturer-tier certification claim.
A Level 2 install gets you charging today. But if you want your EV to power your house during an outage — or you’re thinking about battery storage — the V2H + Battery Package wires it once, designed from the start, so you never open the wall twice. That’s where the real differentiation lives. Also see The Trifecta — whole-home lighting, smart home, and standby power.
Florida ES license ES12000724 active since June 2009. BBB Accredited A+. BuildZoom Score 101 — top 12% of 191,428 FL contractors. Workers comp & liability on file with Mulling Insurance.