Of the 12 ranked Lakeland electrical contractors, none packages EV charging, battery storage, and V2H rough-in under a single written quote. We do — because the panel conversation for all three happens at the same breaker box.
NEMA 14-50 or hardwired EVSE run, sized by load calculation.
Required by Florida code, included in every quote — we verify panel headroom before a wire is run.
Breaker position, conduit pathway, and transfer-ready wiring sized for a Powerwall-class battery.
Dedicated conduit and panel slot reserved so the full V2H upgrade later is hardware plus software — not a panel re-pull.
One written quote covers all four legs. No separate bids per item.
V2H is early-stage in Central Florida in 2026 and the compatible-vehicle list is short. But the electrical infrastructure — panel position, conduit run, dedicated circuit — is identical whether you complete the install this year or in 2027. Doing the conduit work on the same mobilization as your EV charger costs a fraction of returning with a second crew. The storm risk in Central Florida does not wait for the vehicle market to mature.
We do not hold Tesla, Ford, or ChargePoint manufacturer-tier installer status — and we say so plainly before the quote is signed. If your vehicle or charger requires a factory-certified installer, we tell you in writing at the scoping visit.
Need standby power beyond the battery? The whole-home generator conversation shares the same panel visit. If your service needs headroom first, see panel upgrades.
Florida ES license ES12000724 — Residential Specialty, active since June 2009. BuildZoom Score 101 (top 12% of 191,428 FL contractors). BBB Accredited A+ since 2023. Workers comp & liability on file with Mulling Insurance. Load calc on every EV circuit — we confirm panel headroom before a dollar is spent on hardware.
Related: EV Charger Installation · Panel Upgrades · Whole-Home Generators · The Trifecta